Quick answers
What is Nallah Bed Mining Minor Mineral Block No.27?
Nallah Bed Mining Minor Mineral Block No.27 is an approved mining project in Mohi Pora, Kulgam, Jammu and Kashmir. The site covers 12.6 acres.
Who is building it?
The applicant is M/S Ghulam Mohammad Pinchoo.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Oct 2026), as of 27 Nov 2026.
Where is it?
In Mohi Pora, Kulgam, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹6 crore and a site of 12.6 acres.
When was it filed?
The application was filed on 18 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Oct 2026 |
| Application filed | 18 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | M/S Ghulam Mohammad Pinchoo |
| Land area | 12.6 acres (5.1 ha) |
| Project cost | ₹6 crore |
| Village / locality | Mohi Pora |
| Taluk / tehsil | Kulgam |
| District | Kulgam |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00333 |
In context
18 applications in Kulgam since January 2022 are in the same category (Mining): 8 approved, 1 filed or under review, and 9 withdrawn, lapsed or rejected. At 12.6 acres, this one is larger than 72% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Mohi Pora, Kulgam, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral Block No – 26, Z- Ashmuji Bridge Downstream Vishu Nallah,… — environmental approval granted, 1.7 km away
- Minor Mineral Block No. 25 — environmental approval granted, 2.2 km away
- Proposal River Bed Material Mining Project, Block- 24 an area of 4.33 ha at… — lapsed, 3.1 km away
- Minor Mineral (River Bed Material) Shri Mohammad Yaseen Parray, S/O Shri… — environmental approval granted, 4 km away
- Nallah Bed Mining — lapsed, 5.4 km away
- Minor Mineral Block-20, (Revised working area 1.85ha.) T-Brazlo Bridge… — initial checks, 6.7 km away
- Minor Mineral (River Bed Mineral) Mining revised area 1.85 hectare, Block no.… — lapsed, 6.7 km away
- Minor Mineral Block-20, (Revised working area 1.85ha.) T-Brazlo Bridge… — lapsed, 6.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.