Quick answers
What is this project?
Minor Mineral (River Bed material) Project at Block – 23 having an area of 5.71 ha is an approved mining project in Syed Pore, Kathua, Jammu and Kashmir. The site covers 14.1 acres.
Who is building it?
The applicant is Sai Mines.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Jan 2026), as of 27 Nov 2026.
Where is it?
In Syed Pore, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹95 lakh and a site of 14.1 acres.
When was it filed?
The application was filed on 5 Jan 2026.
Project details
| Official title | Minor Mineral (River Bed material) Project at Block – 23 having an area of 5.71 ha. At Johad Khad Village- Johad, Tehsil & District Kathua, J&K U.T. in favor of M/S Sai Mines |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Jan 2026 |
| Application filed | 5 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Sai Mines |
| Land area | 14.1 acres (5.7 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Syed Pore |
| Taluk / tehsil | Kathua |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00356 |
In context
25 applications in Kathua since January 2022 are in the same category (Mining): 21 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 14.1 acres, this one is smaller than 80% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Syed Pore, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retrofitting of WSS Forelain East (Ghatti Badanal) — lapsed, 1 km away
- WSS Forelain East Ghatti Badanal — forest land use approved, 1 km away
- BharatNet in J&K and Ladakh Telecom circles against Package No 13 (Kathua) — lapsed, 1.4 km away
- Water Supply Scheme Juthana Upper — forest land use approved, 1.7 km away
- Minor Mineral (River Bed Material) Mining Project Block-24, Area of 1.0 ha at… — environmental approval granted, 2.8 km away
- Link Road from L023- km 10th of Ghatti Suffain to Juthana Road — more information requested, 2.8 km away
- Water Supply Scheme Juthana Lower — forest land use approved, 4 km away
- WSS Jakhole — forest land use approved, 5.8 km away
All 9 Sai Mines projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.