What is WSS Forelain East Ghatti Badanal?
WSS Forelain East Ghatti Badanal is an approved water and irrigation project in Fafal, Kathua, Jammu and Kashmir. The site covers 3.3 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 8 Jun 2026), as of 27 Nov 2026.
Where is it?
In Fafal, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹6.2 crore; a site of 3.3 acres and 2.3 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 27 Apr 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 8 Jun 2026 |
| Application filed | 27 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 3.3 acres (1.3 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹6.2 crore |
| Village / locality | Fafal |
| Taluk / tehsil | Kathua |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01269 |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 3.3 acres, this one is larger than 90% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Fafal, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retrofitting of WSS Forelain East (Ghatti Badanal) — lapsed, 0 m away
- Minor Mineral (River Bed material) Project at Block – 23 having an area of… — environmental approval granted, 1 km away
- Water Supply Scheme Juthana Upper — forest land use approved, 1.9 km away
- BharatNet in J&K and Ladakh Telecom circles against Package No 13 (Kathua) — lapsed, 2.2 km away
- Minor Mineral (River Bed Material) Mining Project Block-24, Area of 1.0 ha at… — environmental approval granted, 3.6 km away
- Link Road from L023- km 10th of Ghatti Suffain to Juthana Road — more information requested, 3.7 km away
- Water Supply Scheme Juthana Lower — forest land use approved, 5 km away
- Retrofitting of Water Supply scheme Baktha under Jal Jeevan Mission — decision issued, 5.6 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.