What is Developing? Open the mapMap

Environmental approval grantedMining · Punch, Jammu and Kashmir

Minor Mineral (River Bed material) Project, Block – 18 at Mendhar River Upstream Chajjla Bridge Part-II, District- Poonch, JK U.T. in favor of M/S Kesari Nandan Mines

Minor Mineral (River Bed material) Project, Block – 18 at Mendhar River Upstream Chajjla Bridge Part-II, District- Poonch, JK U.T. in favor of M/S Kesari Nandan Mines is an approved mining project in Bandi Checkiyan, Haveli, Punch, Jammu and Kashmir. The site covers 11.4 acres. Its stated project cost is ₹1.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Mar 2026).

See it on the live map All projects in Punch

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since26 Mar 2026
Application filed26 Mar 2026
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantKesari Nandan
Land area11.4 acres (4.6 ha)
Project cost₹1.6 crore
Village / localityBandi Checkiyan
Taluk / tehsilHaveli
DistrictPunch
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00360

In context

14 applications in Punch since January 2022 are in the same category (Mining): 13 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected. At 11.4 acres, this one is smaller than 57% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Bandi Checkiyan, Haveli, Punch, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.