What is Developing? Open the mapMap

Environmental approval grantedMining · Punch, Jammu and Kashmir

Minor Mineral (River Bed Material) Mining Project, Block No. 19, Mendhar River Upstream Chajjla Bridge Part-III, District-Poonch, JK UT (Reduced area 4.20ha.)

Minor Mineral (River Bed Material) Mining Project, Block No. 19, Mendhar River Upstream Chajjla Bridge Part-III, District-Poonch, JK UT (Reduced area 4.20ha.) is an approved mining project in Banola(Banela), Mendhar, Punch, Jammu and Kashmir. The site covers 10.4 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 5 Feb 2026).

See it on the live map All projects in Punch

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since5 Feb 2026
Application filed5 Feb 2026
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantArshdeep Singh
Land area10.4 acres (4.2 ha)
Project cost₹50 lakh
Village / localityBanola(Banela)
Taluk / tehsilMendhar
DistrictPunch
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00411

In context

14 applications in Punch since January 2022 are in the same category (Mining): 13 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected. At 10.4 acres, this one is smaller than 71% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Banola(Banela), Mendhar, Punch, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Arshdeep Singh in Punch

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.