Quick answers
What is 4G Saturation Project Shann (Athialta)?
4G Saturation Project Shann (Athialta) is an approved telecom project in Dharalta, Basohli, Kathua, Jammu and Kashmir. The site covers 0.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 10 Oct 2024), as of 27 Nov 2026.
Where is it?
In Dharalta, Basohli, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹24 lakh; a site of 0.1 acres and 250 m² of forest land.
When was it filed?
The application was filed on 1 Sept 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 10 Oct 2024 |
| Application filed | 1 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 300 m² |
| Forest land | 250 m² |
| Project cost | ₹24 lakh |
| Village / locality | Dharalta |
| Taluk / tehsil | Basohli |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00648 |
In context
25 applications in Kathua since January 2022 are in the same category (Telecom): 18 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0.1 acres, this one is smaller than 57% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dharalta, Basohli, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Scheme Boura — lapsed, 2.1 km away
- WSS Boura — forest land use approved, 2.1 km away
- Construction of L023-(Link Road) From KM 7th of Boura Road To Athialta — lapsed, 2.2 km away
- 4G Saturation Project Ramond Mata (Athialta) — forest land use approved, 2.2 km away
- Road from Dukhat to Berighat under NABARD by PWD(R&B) Division Kathua — under forest review, 2.5 km away
- Water Supply Scheme Upper Dhar — forest land use approved, 4.3 km away
- Water Supply Scheme Athialta Part-2 — lapsed, 4.4 km away
- 4G Saturation Project Jalandaei Mata (Athialta) — forest land use approved, 4.5 km away
More from Mahesh Nair in Kathua
- 4G Saturation Project at Village Domar — more information requested
- 4G Saturation Project Malman (Forlain) — forest land use approved
- 4G Saturation Project Biyan — forest land use approved
- 4G Saturation Project Malad — forest land use approved
- 4G Saturation Project Hadat — forest land use approved
- 4G Saturation Project Plakh — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.