Quick answers
What is 4G Saturation Project at Village Domar?
4G Saturation Project at Village Domar is a proposed telecom project in Domar, Kathua, Jammu and Kashmir. The site covers 0.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Domar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹25 lakh; a site of 0.1 acres and 250 m² of forest land.
When was it filed?
The application was filed on 2 Sept 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 24 Oct 2026 |
| Application filed | 2 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 300 m² |
| Forest land | 250 m² |
| Project cost | ₹25 lakh |
| Village / locality | Domar |
| Taluk / tehsil | Kathua |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01036 |
In context
25 applications in Kathua since January 2022 are in the same category (Telecom): 18 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0.1 acres, this one is smaller than 57% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Domar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Link Road From L022 - Behlu to Shewar — more information requested, 1.2 km away
- WSS Domar — forest land use approved, 1.3 km away
- Retrofitting of Water Supply Scheme Thein under Jal Jeevan Mission — under wildlife review, 3.7 km away
- Retrofitting of Water Supply Scheme Thein under Jal Jeevan Mission — forest land use approved, 3.7 km away
- Water Supply Scheme Thein — lapsed, 3.7 km away
- Water Supply Scheme Thein — lapsed, 3.7 km away
- Water Supply Scheme Thein — lapsed, 3.7 km away
- Water Supply Scheme Thein — more information requested, 5.4 km away
More from Mahesh Nair in Kathua
- 4G Saturation Project Malman (Forlain) — forest land use approved
- 4G Saturation Project Biyan — forest land use approved
- 4G Saturation Project Malad — forest land use approved
- 4G Saturation Project Hadat — forest land use approved
- 4G Saturation Project Plakh — more information requested
- 4G Saturation Project Goduflal — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.