Quick answers
What is this project?
Construction/Upgradation of Road from Thayan to Cheerkoot lastiyal Madmasav is a lapsed road project in Cheeri Koot, Kupwara, Jammu and Kashmir. It seeks 3.6 acres of forest land.
Who is building it?
The applicant is Executive Engineer R&b Division Lolab.
Has it been approved?
No. The application was lapsed on 27 Dec 2024, so it is no longer under consideration.
Where is it?
In Cheeri Koot, Kupwara, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹2.9 crore and 3.6 acres (1.5 ha) of forest land.
When was it filed?
The application was filed on 18 Nov 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Dec 2024 |
| Application filed | 18 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer R&b Division Lolab |
| Forest land | 3.6 acres (1.5 ha) |
| Project cost | ₹2.9 crore |
| Village / locality | Cheeri Koot |
| Taluk / tehsil | Kupwara |
| District | Kupwara |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00867 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Nov 2024 (this page) | Lapsed | ₹2.9 crore | |
| New project filed 4 Nov 2024 | Lapsed | ₹2.9 crore |
In context
29 applications in Kupwara since January 2022 are in the same category (Roads & highways): 0 approved, 11 filed or under review, and 18 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Cheeri Koot, Kupwara, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction/upgradation of Road from Thayan Cheerkote to Lashtiyal Madmadow — lapsed, 0 m away
- Construction/upgradation of Road from Thayan to Cheerkote via LAshtiyal… — lapsed, 0 m away
- Construction/Upgradation of Road from Thayan to Cheerkote via Lashtiyal… — lapsed, 0 m away
- Construction/Upgradation of Road from Thayan to Cheerkoot lastiyal Madmasav — lapsed, 0 m away
- Cosntruction/upgradation of road from Thayan to Cheerkoot via Lashtiyal Madmadav — lapsed, 0 m away
- Construction/Upgradation of Road from Thayan to Cheerkote via Lashtiyal… — initial checks, 100 m away
- Preliminary exploration for Gold, Copper & associated minerals around Lashteal… — forest land use approved, 1.5 km away
- Water Supply Scheme Khumbriyal — more information requested, 3 km away
More from Executive Engineer R&b Division Lolab in Kupwara
- Construction/Upgradation of Road from Thayan to Cheerkote via Lashtiyal… — initial checks
- Construction/upgradation of Road from Thayan Cheerkote to Lashtiyal Madmadow — lapsed
- Construction/upgradation of Road from Thayan to Cheerkote via LAshtiyal… — lapsed
- Construction/Upgradation of Road from Thayan to Cheerkote via Lashtiyal… — lapsed
- Construction/Upgradation of Road From Ring Payen to Ring Bala — lapsed
- Construction of Gratnard Malik Mohalla Road at Khurhama — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.