Quick answers
What is this project?
Construction/Upgradation of Road From Ring Payen to Ring Bala is a lapsed road project in Chunti Wari, Kupwara, Jammu and Kashmir. The site covers 4 acres.
Who is building it?
The applicant is Executive Engineer R&b Division Lolab.
Has it been approved?
No. The application was lapsed on 23 Oct 2024, so it is no longer under consideration.
Where is it?
In Chunti Wari, Kupwara, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹4 crore; a site of 4 acres and 4 acres (1.6 ha) of forest land.
When was it filed?
The application was filed on 20 Jul 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Oct 2024 |
| Application filed | 20 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer R&b Division Lolab |
| Land area | 4 acres (1.6 ha) |
| Forest land | 4 acres (1.6 ha) |
| Project cost | ₹4 crore |
| Village / locality | Chunti Wari |
| Taluk / tehsil | Kupwara |
| District | Kupwara |
| State | Jammu and Kashmir |
| Location from | Site area on record |
| Our reference | WID-JK-02101 |
In context
29 applications in Kupwara since January 2022 are in the same category (Roads & highways): 0 approved, 11 filed or under review, and 18 withdrawn, lapsed or rejected. At 4 acres, this one is smaller than 68% of them.
Where it is
Chunti Wari, Kupwara, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction/Upgradation of Road from Thayan to Cheerkote via Lashtiyal… — initial checks, 17.8 km away
- Construction/upgradation of Road from Thayan Cheerkote to Lashtiyal Madmadow — lapsed, 17.9 km away
- Construction/upgradation of Road from Thayan to Cheerkote via LAshtiyal… — lapsed, 17.9 km away
- Construction/Upgradation of Road from Thayan to Cheerkote via Lashtiyal… — lapsed, 17.9 km away
- Construction/Upgradation of Road from Thayan to Cheerkoot lastiyal Madmasav — lapsed, 17.9 km away
- Construction/Upgradation of Road from Thayan to Cheerkoot lastiyal Madmasav — lapsed, 17.9 km away
- Cosntruction/upgradation of road from Thayan to Cheerkoot via Lashtiyal Madmadav — lapsed, 17.9 km away
- Wss Khurhama — in-principle approval, conditions pending, 18.7 km away
More from Executive Engineer R&b Division Lolab in Kupwara
- Construction/Upgradation of Road from Thayan to Cheerkote via Lashtiyal… — initial checks
- Construction/upgradation of Road from Thayan Cheerkote to Lashtiyal Madmadow — lapsed
- Construction/upgradation of Road from Thayan to Cheerkote via LAshtiyal… — lapsed
- Construction/Upgradation of Road from Thayan to Cheerkote via Lashtiyal… — lapsed
- Construction/Upgradation of Road from Thayan to Cheerkoot lastiyal Madmasav — lapsed
- Construction/Upgradation of Road from Thayan to Cheerkoot lastiyal Madmasav — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.