Quick answers
What is 4G Saturation Project Karlchihal?
4G Saturation Project Karlchihal is an approved telecom project in Kralchihal, Banihal, Ramban, Jammu and Kashmir. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Apr 2026), as of 27 Nov 2026.
Where is it?
In Kralchihal, Banihal, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹24 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 7 Sept 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Apr 2026 |
| Application filed | 7 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹24 lakh |
| Village / locality | Kralchihal |
| Taluk / tehsil | Banihal |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00877 |
In context
30 applications in Ramban since January 2022 are in the same category (Telecom): 26 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2.6 years from filing to approval. At 0 acres, this one is smaller than 100% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kralchihal, Banihal, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retrofitting of Water Supply Scheme Thachi Amkoot — forest land use approved, 1.6 km away
- Diversion of 400KV Kishenpur-New Wanpoh Ckt 3&4 near tower no. 272 — lapsed, 2.3 km away
- Diversion of 400KV Kishenpur-New Wanpoh Ckt 3&4 near tower no. 272 — forest land use approved, 2.3 km away
- Retrofitting of Water Supply Scheme Chamalwas (Additional Land Required) — forest land use approved, 2.5 km away
- Retrofitting of Water Supply Scheme Chamalwas — forest land use approved, 2.8 km away
- Retrofitting of WSS Gund Adalkoot — forest land use approved, 3 km away
- Construction and maintenance of Road from L030-(Link Road) Livera to GagerNag,… — lapsed, 3.1 km away
- 1. Construction and maintenance of Road from L030-(Link Road) Livera to… — more information requested, 3.2 km away
More from Mahesh Nair in Ramban
- 4G Saturation Project Chanchloo — forest land use approved
- 4G Saturation Project Phagowonkote — forest land use approved
- 4G Saturation Project Darshipora — forest land use approved
- 4G Saturation Project Salbala — forest land use approved
- 4G Saturation Project Dachan — forest land use approved
- 4G Saturation Project Gagarsool — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.