Quick answers
What is this project?
Diversion of 400KV Kishenpur-New Wanpoh Ckt 3&4 near tower no. 272 is a lapsed power project in Chamalwas, Banihal, Ramban, Jammu and Kashmir. The site covers 17.6 acres.
Who is building it?
The applicant is Power Grid Corporation of India (POWERGRID).
Has it been approved?
No. The application was lapsed on 30 Jul 2025, so it is no longer under consideration.
Where is it?
In Chamalwas, Banihal, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹6.3 crore; a site of 17.6 acres and 730 m² of forest land.
When was it filed?
The application was filed on 16 Jun 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 400KV Kishenpur-New Wanpoh Ckt 3&4 near tower no. 272
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Jul 2025 |
| Application filed | 16 Jun 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Power |
| Applicant | Power Grid Corporation of India (POWERGRID) |
| Land area | 17.6 acres (7.1 ha) |
| Forest land | 730 m² |
| Project cost | ₹6.3 crore |
| Village / locality | Chamalwas |
| Taluk / tehsil | Banihal |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00639 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 16 Jun 2025 (this page) | Lapsed | 17.6 acres | ₹6.3 crore |
| New project filed 5 May 2025 | Forest land use approved | 17.6 acres | ₹6.3 crore |
In context
6 applications in Ramban since January 2022 are in the same category (Power): 2 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chamalwas, Banihal, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 400KV Kishenpur-New Wanpoh Ckt 3&4 near tower no. 272 — forest land use approved, 0 m away
- Retrofitting of Water Supply Scheme Chamalwas — forest land use approved, 700 m away
- Construction and maintenance of Road from L030-(Link Road) Livera to GagerNag,… — lapsed, 850 m away
- 1. Construction and maintenance of Road from L030-(Link Road) Livera to… — more information requested, 900 m away
- Permission for Laying of OFC from Ramsoo-Neel in Ramban District — lapsed, 1.3 km away
- Water Supply Scheme Bohardar under JJM ( Additional Land Required) — forest land use approved, 1.7 km away
- Retrofitting of Water Supply Scheme Chamalwas (Additional Land Required) — forest land use approved, 1.8 km away
- 4G Saturation Project Karlchihal — forest land use approved, 2.3 km away
More from Power Grid Corporation of India (POWERGRID) in Ramban
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — lapsed
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — forest land use approved
- Diversion of 1.8 Kms of 400 kV D/c Kishenpur-New Wanpoh — lapsed
5 Power Grid Corporation of India projects in Ramban
All 45 Power Grid Corporation of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.