What is Developing? Open the mapMap

Under wildlife reviewWater & irrigation · Kathua, Jammu and Kashmir

Retrofitting of Water Supply Scheme Thein under Jal Jeevan Mission

Retrofitting of Water Supply Scheme Thein under Jal Jeevan Mission is a proposed water and irrigation project in Athoon, Basohli, Kathua, Jammu and Kashmir. The site covers 0.9 acres. Its stated project cost is ₹5.5 crore. As of 27 Nov 2026, its status is “Under wildlife review” (since 21 Sept 2023).

See it on the live map All projects in Kathua

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Retrofitting of Water Supply Scheme Thein under Jal Jeevan Mission is a proposed water and irrigation project in Athoon, Basohli, Kathua, Jammu and Kashmir. The site covers 0.9 acres.

Who is building it?

The applicant is Chief Engineer Jal Shakti Vibhag.

Has it been approved?

Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.

Where is it?

In Athoon, Basohli, Kathua, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹5.5 crore and a site of 0.9 acres.

When was it filed?

The application was filed on 21 Sept 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Retrofitting of Water Supply Scheme Thein under Jal Jeevan Mission

Project details

StatusUnder wildlife review
Status since21 Sept 2023
Application filed21 Sept 2023
Approval soughtWildlife review
Application typeNew project
SectorWater & irrigation
ApplicantChief Engineer Jal Shakti Vibhag
Land area3,600 m²
Project cost₹5.5 crore
Village / localityAthoon
Taluk / tehsilBasohli
DistrictKathua
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-03319

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 21 Sept 2023 (this page)Under wildlife review0.9 acres₹5.5 crore
New project filed 20 Sept 2023Forest land use approved0.9 acres₹5.5 crore

In context

125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 0.9 acres, this one is smaller than 62% of them.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Athoon, Basohli, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Chief Engineer Jal Shakti Vibhag in Kathua

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.