Quick answers
What is 4G Saturation Project Ashmar?
4G Saturation Project Ashmar is a lapsed telecom project in Ashmar, Ramban, Jammu and Kashmir. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 28 Dec 2023, so it is no longer under consideration.
Where is it?
In Ashmar, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹24 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 6 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Dec 2023 |
| Application filed | 6 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹24 lakh |
| Village / locality | Ashmar |
| Taluk / tehsil | Ramban |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01423 |
In context
30 applications in Ramban since January 2022 are in the same category (Telecom): 26 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2.6 years from filing to approval. At 0 acres, this one is smaller than 100% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ashmar, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retrofitting of Water Supply Scheme Famrote — forest land use approved, 850 m away
- Construction of road from Kappanbass to Alog Top. — lapsed, 1.5 km away
- Retrofitting of WSS Sangaldan — forest land use approved, 2.5 km away
- Sawalkot HE Project (1856 MW) — environmental approval granted, 2.9 km away
- Sawalkot HE Project (1856 MW) — cleared for impact study, 2.9 km away
- Retrofitting of WSS Seripura — forest land use approved, 3.2 km away
- Minor Mineral Block Gypsum Mining — under environmental review, 3.3 km away
- Minor Mineral Block Gypsum Mining — environmental approval granted, 3.3 km away
More from Mahesh Nair in Ramban
- 4G Saturation Project Chanchloo — forest land use approved
- 4G Saturation Project Phagowonkote — forest land use approved
- 4G Saturation Project Darshipora — forest land use approved
- 4G Saturation Project Karlchihal — forest land use approved
- 4G Saturation Project Salbala — forest land use approved
- 4G Saturation Project Dachan — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.