Quick answers
What is Hung Hydro Electric Power Station?
Hung Hydro Electric Power Station is a proposed water and irrigation project in Kolan, Kangan, Ganderbal, Jammu and Kashmir. The site covers 4.8 acres.
Who is building it?
The applicant is Jammu and Kashmir Energy Development Agency (Jakeda), S&t Deptt. J&k.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Kolan, Kangan, Ganderbal, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹2 crore; a site of 4.8 acres and 3.2 acres (1.3 ha) of forest land.
When was it filed?
The application was filed on 29 Oct 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 30 Oct 2026 |
| Application filed | 29 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Jammu and Kashmir Energy Development Agency (Jakeda), S&t Deptt. J&k |
| Land area | 4.8 acres (2 ha) |
| Forest land | 3.2 acres (1.3 ha) |
| Project cost | ₹2 crore |
| Village / locality | Kolan |
| Taluk / tehsil | Kangan |
| District | Ganderbal |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01564 |
In context
15 applications in Ganderbal since January 2022 are in the same category (Water & irrigation): 2 approved, 6 filed or under review, and 7 withdrawn, lapsed or rejected. At 4.8 acres, this one is larger than 79% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kolan, Kangan, Ganderbal, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Basmai Hydro Electric Power Station — lapsed, 650 m away
- Wss Sonamarg — more information requested, 5.1 km away
- Wss Sonamarg — more information requested, 5.8 km away
- Wss Sonamarg — lapsed, 5.8 km away
- Wss Sonamarg — lapsed, 5.8 km away
- Wss Sonamarg — lapsed, 5.8 km away
- Sonmarg Hydro Electric Power Station — lapsed, 7.9 km away
- Distributed Snowpack modelling, Real Time Avalanche Monitoring and Autonomous… — under wildlife review, 8.1 km away
More from Jammu and Kashmir Energy Development Agency (Jakeda), S&t Deptt. J&k in Ganderbal
- Basmai Hydro Electric Power Station — lapsed
- Sonmarg Hydro Electric Power Station — lapsed
3 Jammu and Kashmir projects in Ganderbal
All 11 Jammu and Kashmir projects across India