Quick answers
What is Sonmarg Hydro Electric Power Station?
Sonmarg Hydro Electric Power Station is a lapsed water and irrigation project in Sonamarg, Kangan, Ganderbal, Jammu and Kashmir. The site covers 5.7 acres.
Who is building it?
The applicant is Jammu and Kashmir Energy Development Agency (Jakeda), S&t Deptt. J&k.
Has it been approved?
No. The application was lapsed on 22 Apr 2026, so it is no longer under consideration.
Where is it?
In Sonamarg, Kangan, Ganderbal, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹28 crore; a site of 5.7 acres and 1.8 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 8 Jul 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Apr 2026 |
| Application filed | 8 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Jammu and Kashmir Energy Development Agency (Jakeda), S&t Deptt. J&k |
| Land area | 5.7 acres (2.3 ha) |
| Forest land | 1.8 acres (0.7 ha) |
| Project cost | ₹28 crore |
| Village / locality | Sonamarg |
| Taluk / tehsil | Kangan |
| District | Ganderbal |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02099 |
In context
15 applications in Ganderbal since January 2022 are in the same category (Water & irrigation): 2 approved, 6 filed or under review, and 7 withdrawn, lapsed or rejected. At 5.7 acres, this one is larger than 93% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sonamarg, Kangan, Ganderbal, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Distributed Snowpack modelling, Real Time Avalanche Monitoring and Autonomous… — decision issued, 1.9 km away
- Distributed Snowpack modelling, Real Time Avalanche Monitoring and Autonomous… — under wildlife review, 1.9 km away
- Wss Sonamarg — more information requested, 2.2 km away
- Wss Sonamarg — lapsed, 2.2 km away
- Wss Sonamarg — lapsed, 2.2 km away
- Wss Sonamarg — lapsed, 2.2 km away
- Wss Sonamarg — more information requested, 3.3 km away
- Hung Hydro Electric Power Station — initial checks, 7.9 km away
More from Jammu and Kashmir Energy Development Agency (Jakeda), S&t Deptt. J&k in Ganderbal
- Hung Hydro Electric Power Station — initial checks
- Basmai Hydro Electric Power Station — lapsed
3 Jammu and Kashmir projects in Ganderbal
All 11 Jammu and Kashmir projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.