Quick answers
What is Water Supply Scheme Kagrore?
Water Supply Scheme Kagrore is a lapsed water and irrigation project in Kagrod, Basohli, Kathua, Jammu and Kashmir. The site covers 1.8 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
No. The application was lapsed on 9 Jan 2025, so it is no longer under consideration.
Where is it?
In Kagrod, Basohli, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹5.1 crore; a site of 1.8 acres and 2,150 m² of forest land.
When was it filed?
The application was filed on 25 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Jan 2025 |
| Application filed | 25 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 1.8 acres (0.7 ha) |
| Forest land | 2,150 m² |
| Project cost | ₹5.1 crore |
| Village / locality | Kagrod |
| Taluk / tehsil | Basohli |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01773 |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 1.8 acres, this one is larger than 74% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kagrod, Basohli, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- L025-(Link Road) Ghagrore Madhrakhi Road Km 1st to Lari, Length = 3.000 Km — more information requested, 450 m away
- DIVERSION OF 132kV SEWA2-HIRANAGAR TL — forest land use approved, 1 km away
- 4G Saturation Project Karmatha (Ghagrore) — forest land use approved, 3 km away
- 4G Saturation Project Plakh — more information requested, 3.6 km away
- L025- (Link Road) Km 9th of Dhar Mahanpur road to Rangoti — more information requested, 4.9 km away
- 4G Saturation Project Avatar — forest land use approved, 6.2 km away
- Water Supply Scheme Poonda Bera — forest land use approved, 6.9 km away
- Water Supply Scheme Jhanker — forest land use approved, 7.4 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.