Quick answers
What is Water Supply Scheme Randood?
Water Supply Scheme Randood is a lapsed water and irrigation project in Mangloor, Hiranagar, Kathua, Jammu and Kashmir. The site covers 0.6 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
No. The application was lapsed on 1 Jan 2026, so it is no longer under consideration.
Where is it?
In Mangloor, Hiranagar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹3.3 crore; a site of 0.6 acres and 650 m² of forest land.
When was it filed?
The application was filed on 23 Jan 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Jan 2026 |
| Application filed | 23 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 2,400 m² |
| Forest land | 650 m² |
| Project cost | ₹3.3 crore |
| Village / locality | Mangloor |
| Taluk / tehsil | Hiranagar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02924 |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 0.6 acres, this one is smaller than 77% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mangloor, Hiranagar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Wss Seswan — lapsed, 1.6 km away
- WSS Bakhta — lapsed, 3.7 km away
- Retrofitting of Water Supply scheme Baktha under Jal Jeevan Mission — decision issued, 3.7 km away
- Retrofitting of Water Supply scheme Baktha under Jal Jeevan Mission — forest land use approved, 3.7 km away
- Standalone Grinding Unit with Cement Production Capacity of 2.0 Million TPA… — cleared for impact study, 5.2 km away
- Water Supply Scheme Dinga Amb — lapsed, 5.2 km away
- Water Supply Scheme Dhalta — lapsed, 5.3 km away
- Wss Kakra — lapsed, 5.5 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
- Water Supply Scheme Sarthan — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.