Quick answers
What is Wss Dabbi?
Wss Dabbi is a lapsed water and irrigation project in Dinga Amb, Hiranagar, Kathua, Jammu and Kashmir. The site covers 1.1 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
No. The application was lapsed on 1 Jan 2026, so it is no longer under consideration.
Where is it?
In Dinga Amb, Hiranagar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹3.4 crore; a site of 1.1 acres and 870 m² of forest land.
When was it filed?
The application was filed on 8 Mar 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Wss Dabbi
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Jan 2026 |
| Application filed | 8 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 1.1 acres (0.4 ha) |
| Forest land | 870 m² |
| Project cost | ₹3.4 crore |
| Village / locality | Dinga Amb |
| Taluk / tehsil | Hiranagar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02066 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Jul 2023 | Lapsed | 2.4 acres | ₹3.4 crore |
| New project filed 8 Mar 2023 (this page) | Lapsed | 1.1 acres | ₹3.4 crore |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 1.1 acres, this one is larger than 50% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dinga Amb, Hiranagar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- WSS Dabbi — forest land use approved, 0 m away
- Wss Dabbi — lapsed, 150 m away
- Wss Kouli Koper — lapsed, 1.4 km away
- Wss Kouli Koper — lapsed, 1.4 km away
- Wss Kakra — lapsed, 1.6 km away
- Water Supply Scheme Dinga Amb — lapsed, 1.8 km away
- Wss Kakra — lapsed, 2.3 km away
- Water Supply Scheme Kakra — lapsed, 2.3 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.