Quick answers
What is 4G Saturation Project Lalli?
4G Saturation Project Lalli is an approved telecom project in Lali, Udhampur, Jammu and Kashmir. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 25 Sept 2024), as of 27 Nov 2026.
Where is it?
In Lali, Udhampur, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹24 lakh; a site of 0 acres and 190 m² of forest land.
When was it filed?
The application was filed on 13 Sept 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 25 Sept 2024 |
| Application filed | 13 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 190 m² |
| Project cost | ₹24 lakh |
| Village / locality | Lali |
| Taluk / tehsil | Udhampur |
| District | Udhampur |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02205 |
In context
40 applications in Udhampur since January 2022 are in the same category (Telecom): 27 approved, 3 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lali, Udhampur, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Wss Damnote Radnote(Additional Area) — more information requested, 1.2 km away
- Improvemeent and Augmentation of Water Supply to Vill. Damnote and Radnote… — forest land use approved, 1.6 km away
- Improvemeent and Augmentation of Water Supply to Vill. Damnote and Radnote… — more information requested, 1.6 km away
- Improvement and Augmentation of Water Supply Scheme Lalli under JJM — lapsed, 2.4 km away
- Improvement and Augmentation of Water Supply Scheme Lalli under JJM — forest land use approved, 2.4 km away
- Improvement and Augmentation of Water Supply to Village Dubi Gali and Nali… — lapsed, 3.8 km away
- Improvement and Augmentation of Water Supply to Village Dubi Gali and Nali… — forest land use approved, 3.8 km away
- Construction of road from Patti to Ajjal via Gali, Length=2.00 Kms — in-principle approval, conditions pending, 4.2 km away
More from Mahesh Nair in Udhampur
- 4G Saturation Project at Alu Top — more information requested
- 4G Saturation Project Kandal — forest land use approved
- 4G Saturation Project Lower Bali — forest land use approved
- Overhead Ofc Laying Route Through Forest Area Upto Kandrah 4g Saturation Site — forest land use approved
- 4G Saturation Project - Kossar — more information requested
- 4G Saturation Project KOSSAR — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.