Quick answers
What is Water supply scheme Kardoh?
Water supply scheme Kardoh is a lapsed water and irrigation project in Kardoh, Bani, Kathua, Jammu and Kashmir. The site covers 1.8 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
No. The application was lapsed on 13 Mar 2023, so it is no longer under consideration.
Where is it?
In Kardoh, Bani, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹2.1 crore; a site of 1.8 acres and 1.2 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 27 Feb 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Water Supply Scheme Kardoh
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Mar 2023 |
| Application filed | 27 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 1.8 acres (0.7 ha) |
| Forest land | 1.2 acres (0.5 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Kardoh |
| Taluk / tehsil | Bani |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02251 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Apr 2023 | Forest land use approved | 1.8 acres | ₹2.1 crore |
| New project filed 27 Feb 2023 (this page) | Lapsed | 1.8 acres | ₹2.1 crore |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 1.8 acres, this one is larger than 76% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kardoh, Bani, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Scheme Kardoh — forest land use approved, 0 m away
- Link road from Challa to Banjal under NABARD RIDF-XXX (Length 6.00 kms)… — initial checks, 3.7 km away
- Water Supply Scheme Siara — forest land use approved, 3.9 km away
- Water Supply Scheme Hut — forest land use approved, 4.4 km away
- Water Supply Scheme Fatehpur — forest land use approved, 4.5 km away
- Water supply scheme SITTI — forest land use approved, 4.8 km away
- Water Supply Scheme Fatehpur — lapsed, 4.8 km away
- Water Supply Scheme Sandhi — forest land use approved, 5.1 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.