Quick answers
What is Water Supply Scheme Neel (New)?
Water Supply Scheme Neel (New) is an approved water and irrigation project in Neel, Banihal, Ramban, Jammu and Kashmir. The site covers 1.5 acres.
Who is building it?
The applicant is Jal Shakti Department.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Apr 2026), as of 27 Nov 2026.
Where is it?
In Neel, Banihal, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹9 crore; a site of 1.5 acres and 1.4 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 26 May 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Apr 2026 |
| Application filed | 26 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Jal Shakti Department |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 1.4 acres (0.6 ha) |
| Project cost | ₹9 crore |
| Village / locality | Neel |
| Taluk / tehsil | Banihal |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02296 |
In context
100 applications in Ramban since January 2022 are in the same category (Water & irrigation): 87 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 1.5 acres, this one is larger than 71% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Neel, Banihal, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road from PMGSY Road Perhinder to Tatika via Suranga Ludhnihal length= 3.00… — initial checks, 1.7 km away
- Retrofitting of Water Supply Scheme Bohardar — forest land use approved, 1.8 km away
- Retrofitting of Water Supply Scheme Dhanmasta — forest land use approved, 2.9 km away
- Retrofitting of Water Supply Scheme Chamalwas (Additional Land Required) — forest land use approved, 4.5 km away
- Name of the Project Water Supply Scheme Pogal (Retrofitting) — forest land use approved, 5.1 km away
- Water Supply Scheme Bohardar under JJM ( Additional Land Required) — forest land use approved, 5.3 km away
- Permission for Laying of OFC from Ramsoo-Neel in Ramban District — lapsed, 5.4 km away
- Retrofitting of Water Supply Scheme Duligam — more information requested, 5.7 km away
More from Jal Shakti Department in Ramban
- Water Supply Scheme Thachi Amkote — forest land use approved
- Improvement/Augmentation/Extension of WSS Tarkada Govindpura — forest land use approved
- Water Supply Scheme Balihote — more information requested
- Water Supply Scheme Sumber Upper-A — lapsed
- WSS Dharelta — forest land use approved
- WSS Chadsal — forest land use approved
106 Jal Shakti Department, Jammu and Kashmir projects in Ramban
All 1,350 Jal Shakti Department, Jammu and Kashmir projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.