Quick answers
What is this project?
Road from PMGSY Road Perhinder to Tatika via Suranga Ludhnihal length= 3.00 Kms (Under NABARD RIDF-XXIX) is a proposed road project in Bohar Dhar, Banihal, Ramban, Jammu and Kashmir. The site covers 4.4 acres.
Who is building it?
The applicant is Iqbal Ahmad Khan.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Bohar Dhar, Banihal, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹3.6 crore; a site of 4.4 acres and 1,120 m² of forest land.
When was it filed?
The application was filed on 23 Nov 2026.
Project details
| Official title | Construction of Road from PMGSY Road Perhinder to Tatika via Suranga Ludhnihal length= 3.00 Kms (Under NABARD RIDF-XXIX). |
|---|---|
| Status | Initial checks |
| Status since | 24 Nov 2026 |
| Application filed | 23 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Iqbal Ahmad Khan |
| Land area | 4.4 acres (1.8 ha) |
| Forest land | 1,120 m² |
| Project cost | ₹3.6 crore |
| Village / locality | Bohar Dhar |
| Taluk / tehsil | Banihal |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02587 |
In context
57 applications in Ramban since January 2022 are in the same category (Roads & highways): 4 approved, 35 filed or under review, and 18 withdrawn, lapsed or rejected. At 4.4 acres, this one is smaller than 68% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bohar Dhar, Banihal, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Scheme Neel (New) — forest land use approved, 1.7 km away
- Retrofitting of Water Supply Scheme Dhanmasta — forest land use approved, 2.1 km away
- Retrofitting of Water Supply Scheme Chamalwas (Additional Land Required) — forest land use approved, 3.4 km away
- Retrofitting of Water Supply Scheme Bohardar — forest land use approved, 3.5 km away
- Water Supply Scheme Bohardar under JJM ( Additional Land Required) — forest land use approved, 3.7 km away
- Permission for Laying of OFC from Ramsoo-Neel in Ramban District — lapsed, 3.9 km away
- Diversion of 400KV Kishenpur-New Wanpoh Ckt 3&4 near tower no. 272 — lapsed, 4.9 km away
- Diversion of 400KV Kishenpur-New Wanpoh Ckt 3&4 near tower no. 272 — forest land use approved, 4.9 km away
More from Iqbal Ahmad Khan in Ramban
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.