Quick answers
What is this project?
Diversion of 0.0219 of Forest Land for construction of Mobile tower at Malhar, Distt Kathua is a proposed telecom project in Kohag, Billawar, Kathua, Jammu and Kashmir. The site covers 0 acres.
Who is building it?
The applicant is Indus Towers LTD.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Kohag, Billawar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹7 lakh; a site of 0 acres and 220 m² of forest land.
When was it filed?
The application was filed on 26 Aug 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 26 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Indus Towers LTD |
| Land area | 200 m² |
| Forest land | 220 m² |
| Project cost | ₹7 lakh |
| Village / locality | Kohag |
| Taluk / tehsil | Billawar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02379 |
In context
25 applications in Kathua since January 2022 are in the same category (Telecom): 18 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kohag, Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Tower to Enhance Operational Connectivity — lapsed, 400 m away
- Construction of Tower to Enhance Operational Connectivity — lapsed, 400 m away
- Water Supply Scheme Kindli — forest land use approved, 2.2 km away
- Water Supply Scheme Sadrota — lapsed, 3.9 km away
- Water Supply Scheme Sadrota — forest land use approved, 3.9 km away
- Water Supply Scheme Dunga Banjal — forest land use approved, 6 km away
- Water Supply Scheme Machhedi — forest land use approved, 6.4 km away
- Water Supply Scheme Rasial Thal — forest land use approved, 6.5 km away
All 165 Indus Towers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.