Quick answers
What is Water Supply Scheme Sadrota?
Water Supply Scheme Sadrota is an approved water and irrigation project in Sadrota, Billawar, Kathua, Jammu and Kashmir. The site covers 5.5 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Apr 2026), as of 27 Nov 2026.
Where is it?
In Sadrota, Billawar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹4.4 crore; a site of 5.5 acres and 2,780 m² of forest land.
When was it filed?
The application was filed on 8 May 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 15 Apr 2026 |
| Application filed | 8 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 5.5 acres (2.2 ha) |
| Forest land | 2,780 m² |
| Project cost | ₹4.4 crore |
| Village / locality | Sadrota |
| Taluk / tehsil | Billawar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00634 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 May 2023 (this page) | Forest land use approved | 5.5 acres | ₹4.4 crore |
| New project filed 30 Apr 2023 | Lapsed | 5.7 acres | ₹4.4 crore |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 5.5 acres, this one is larger than 97% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sadrota, Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Scheme Sadrota — lapsed, 0 m away
- Water Supply Scheme Kindli — forest land use approved, 3.1 km away
- Water Supply Scheme Galli Duggain — lapsed, 3.7 km away
- Diversion of 0.0219 of Forest Land for construction of Mobile tower at Malhar,… — under forest review, 3.9 km away
- Construction of Tower to Enhance Operational Connectivity — lapsed, 4.3 km away
- Construction of Tower to Enhance Operational Connectivity — lapsed, 4.3 km away
- Water Supply Scheme Dunga Banjal — forest land use approved, 4.5 km away
- Water Supply Scheme Machhedi — forest land use approved, 4.6 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.