Quick answers
What is 4G Saturation project Sarar?
4G Saturation project Sarar is a proposed telecom project in Sarar Karpalt, Chenani, Udhampur, Jammu and Kashmir. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Sarar Karpalt, Chenani, Udhampur, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹24 lakh; a site of 0 acres and 190 m² of forest land.
When was it filed?
The application was filed on 29 Dec 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 27 Jan 2024 |
| Application filed | 29 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 190 m² |
| Project cost | ₹24 lakh |
| Village / locality | Sarar Karpalt |
| Taluk / tehsil | Chenani |
| District | Udhampur |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02390 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Dec 2023 (this page) | More information requested | 0 acres | ₹24 lakh |
| New project filed 22 Sept 2023 | Under wildlife review | 0 acres | ₹24 lakh |
In context
40 applications in Udhampur since January 2022 are in the same category (Telecom): 27 approved, 3 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarar Karpalt, Chenani, Udhampur, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation project Sarar — under wildlife review, 0 m away
- Improvement and Augumentation of Wss Bupp Sarar — more information requested, 1 km away
- Improvement and Augumentation of Wss Bupp Sarar — lapsed, 1 km away
- Wss Jig — forest land use approved, 1.9 km away
- 4G Saturation Project Gashand — forest land use approved, 2.1 km away
- Construction of Link Road Mantalai Sira road Km 15th to Thanoi Koi — initial checks, 2.5 km away
- Wss Kossar — lapsed, 2.7 km away
- Wss Kossar — more information requested, 2.7 km away
More from Mahesh Nair in Udhampur
- 4G Saturation Project at Alu Top — more information requested
- 4G Saturation Project Kandal — forest land use approved
- 4G Saturation Project Lower Bali — forest land use approved
- Overhead Ofc Laying Route Through Forest Area Upto Kandrah 4g Saturation Site — forest land use approved
- 4G Saturation Project - Kossar — more information requested
- 4G Saturation Project KOSSAR — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.