Project details
| Status | More information requested |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 28 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 500 m² |
| Forest land | 500 m² |
| Project cost | ₹24 lakh |
| Village / locality | Murrah |
| Taluk / tehsil | Surankote |
| District | Punch |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02396 |
In context
21 applications in Punch since January 2022 are in the same category (Telecom): 11 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.1 acres, this one is smaller than 67% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Murrah, Surankote, Punch, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- WSS Dophali — in-principle approval, conditions pending, 200 m away
- WSS Banali — in-principle approval, conditions pending, 3.7 km away
- WSS Dhara Mohra Sanglani — in-principle approval, conditions pending, 4.2 km away
- Construction of Road From Hari Katha Meena Via Bara Pathar Chandimarh — more information requested, 4.9 km away
- WSS Dhara — more information requested, 5.1 km away
- 4G Saturation Project Allah Khodi — lapsed, 5.4 km away
- 4G Saturation Project Allah Khodi — under wildlife review, 5.4 km away
- minor mineral Block no 30, Suran River Downstream Bafaliaz Bridge, Bafaliaz… — environmental approval granted, 5.6 km away
More from Mahesh Nair in Punch
- 4G Saturation Project Peer Ki Gali -1 — forest land use approved
- 4G Saturation Project Allah Khori (Chandimarh) — forest land use approved
- 4G Saturation Project Allah Khodi — lapsed
- 4G Saturation Project Peer Ki Gali — more information requested
- 4G Saturation Project Upper Kulain Naarol — forest land use approved
- 4G Saturation Project Chatta Paani — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.