Quick answers
What is Water Supply Scheme Upper Rajwalta?
Water Supply Scheme Upper Rajwalta is a lapsed water and irrigation project in Rajwalta(Rajwatta), Billawar, Kathua, Jammu and Kashmir. The site covers 1.3 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
No. The application was lapsed on 15 Mar 2023, so it is no longer under consideration.
Where is it?
In Rajwalta(Rajwatta), Billawar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹6.2 crore; a site of 1.3 acres and 2,600 m² of forest land.
When was it filed?
The application was filed on 10 Jul 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Mar 2023 |
| Application filed | 10 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 2,600 m² |
| Project cost | ₹6.2 crore |
| Village / locality | Rajwalta(Rajwatta) |
| Taluk / tehsil | Billawar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02423 |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 1.3 acres, this one is larger than 60% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rajwalta(Rajwatta), Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- WSS Upper Rajwalta — forest land use approved, 0 m away
- 4G Saturation Project Khimbli & Dang — forest land use approved, 600 m away
- WSS Porth — forest land use approved, 3 km away
- Water Supply Scheme Aglidhar 1 — forest land use approved, 3.6 km away
- 4G Saturation Project Bandhi & Mohni (Galak) — forest land use approved, 3.7 km away
- Water Supply Scheme Aglidhar — forest land use approved, 4.1 km away
- WSS Aglidhar — lapsed, 4.1 km away
- 4G Saturation Project Malman (Forlain) — forest land use approved, 4.4 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.