Project details
| Status | Lapsed |
|---|---|
| Status since | 24 May 2024 |
| Application filed | 14 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Reliance Jio Infocomm Kashmir Circle |
| Land area | 1,500 m² |
| Forest land | 1,450 m² |
| Project cost | ₹4 lakh |
| Village / locality | Hardushuo |
| Taluk / tehsil | Sopore |
| District | Baramula |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02504 |
In context
10 applications in Baramula since January 2022 are in the same category (Telecom): 2 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hardushuo, Sopore, Baramula, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4g Saturation Project in Jk — more information requested, 1.1 km away
- Water Supply Scheme Rampora Rajpora — more information requested, 1.5 km away
- Water Supply Scheme Rampora Rajpora — lapsed, 1.5 km away
- Imp. of Inner Links at Diff Spots at Pehwar Rampora — lapsed, 2.3 km away
- Improvement of Inner Links at Different Spots at Pahiwar Rampora — lapsed, 2.3 km away
- Upgradation of Pahivaar to Marbal road — lapsed, 3.5 km away
- WSS Sangri Muqam — lapsed, 4.3 km away
- Water Supply Scheme Sangri Muqam — more information requested, 4.4 km away
More from Reliance Jio Infocomm Kashmir Circle in Baramula
- Extension of Mobile Coverage for the proposed G20 Meet at Cafteria view point… — forest land use approved
- Mobile tower site at Kongdori Phase II Gulmarg for proposed G20 Meet — application filed
- Extension of Mobile Coverage for Proposed G20 Meet in Gulmarg — application filed
4 Reliance Jio Infocomm (Jio) projects in Baramula
All 222 Reliance Jio Infocomm (Jio) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.