Project details
| Status | Forest land use approved |
|---|---|
| Status since | 13 Oct 2026 |
| Application filed | 6 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Reliance Jio Infocomm Kashmir Circle |
| Land area | 200 m² |
| Forest land | 250 m² |
| Project cost | ₹10 lakh |
| Village / locality | Forest Block |
| Taluk / tehsil | Tangmarg |
| District | Baramula |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03124 |
In context
10 applications in Baramula since January 2022 are in the same category (Telecom): 2 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Forest Block, Tangmarg, Baramula, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Airtel Owned Site at Tangmarg-Gulmarg View Point — lapsed, 50 m away
- Airtel Owned Site at Tangmarg-Gulmarg View Point — application filed, 50 m away
- Operational Track Drang Loading Point to Banal — lapsed, 1 km away
- Tourist Hut at Drung — lapsed, 1.1 km away
- WSS Hariwatnoo Kilwara — lapsed, 1.5 km away
- Upgradation and Re-Development of JKTDC Unit at Gulmarag — more information requested, 1.6 km away
- Upgradation and Re-Development of JKTDC Unit at Gulmarag — decision issued, 1.6 km away
- WSS Hariwatnoo Kilwara (Pipe Line) — forest land use approved, 2 km away
More from Reliance Jio Infocomm Kashmir Circle in Baramula
- Fiberisation of Rampur Sopore, Cell on Wheels (COW) Tower — lapsed
- Mobile tower site at Kongdori Phase II Gulmarg for proposed G20 Meet — application filed
- Extension of Mobile Coverage for Proposed G20 Meet in Gulmarg — application filed
4 Reliance Jio Infocomm (Jio) projects in Baramula
All 222 Reliance Jio Infocomm (Jio) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.