Quick answers
What is Water Supply Scheme Adhat?
Water Supply Scheme Adhat is an approved water and irrigation project in Hadat, Basohli, Kathua, Jammu and Kashmir. The site covers 0.3 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Apr 2026), as of 27 Nov 2026.
Where is it?
In Hadat, Basohli, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹1.9 crore; a site of 0.3 acres and 1,110 m² of forest land.
When was it filed?
The application was filed on 12 May 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 12 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 1,300 m² |
| Forest land | 1,110 m² |
| Project cost | ₹1.9 crore |
| Village / locality | Hadat |
| Taluk / tehsil | Basohli |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02687 |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 0.3 acres, this one is smaller than 91% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hadat, Basohli, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Up-Gradation of Road From Dhamlar to Dhar Dugnoo Via Huttar. — more information requested, 2.4 km away
- Water Supply Scheme Chunnera — forest land use approved, 2.7 km away
- 4G Saturation Project Hadat — forest land use approved, 3.5 km away
- 4G Saturation Project Chunera — forest land use approved, 3.6 km away
- Water Supply Scheme Dhar Mahanpur — forest land use approved, 4.1 km away
- 4G Saturation Project Phyat. Gutra (Dhardugnoo) — forest land use approved, 4.2 km away
- Water Supply Scheme Mata Bankhandi — forest land use approved, 4.7 km away
- Water Supply Scheme Plail — forest land use approved, 4.8 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.