Quick answers
What is 4G Saturation Project Pathi?
4G Saturation Project Pathi is an approved telecom project in Pathi, Udhampur, Jammu and Kashmir. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 24 Jun 2024), as of 27 Nov 2026.
Where is it?
In Pathi, Udhampur, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹24 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 13 Sept 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 24 Jun 2024 |
| Application filed | 13 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹24 lakh |
| Village / locality | Pathi |
| Taluk / tehsil | Udhampur |
| District | Udhampur |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02999 |
In context
40 applications in Udhampur since January 2022 are in the same category (Telecom): 27 approved, 3 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pathi, Udhampur, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road L121 (Link Road) Pangara Jagir PMGSY road Km 4th to Saroda Trimbli Led — more information requested, 1.4 km away
- Improvement and Augmentation to Vill. Tirshi and Narore Under Wss Tirshi Narore — forest land use approved, 2 km away
- Wss Mali Pangara — forest land use approved, 2 km away
- L104 (Link Road) Approach road to Himbra bridge(PWD Road) Km 2nd to Nambal — initial checks, 2.1 km away
- Construction of NTPHC Pangara — more information requested, 2.4 km away
- Wss Mali Pangara — lapsed, 2.7 km away
- Wss Ladha — forest land use approved, 3.7 km away
- Wss Bali — lapsed, 4.1 km away
More from Mahesh Nair in Udhampur
- 4G Saturation Project at Alu Top — more information requested
- 4G Saturation Project Kandal — forest land use approved
- 4G Saturation Project Lower Bali — forest land use approved
- Overhead Ofc Laying Route Through Forest Area Upto Kandrah 4g Saturation Site — forest land use approved
- 4G Saturation Project - Kossar — more information requested
- 4G Saturation Project KOSSAR — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.