Quick answers
What is 4G Saturation Project Ukhral?
4G Saturation Project Ukhral is an approved telecom project in Pogal, Banihal, Ramban, Jammu and Kashmir. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Apr 2026), as of 27 Nov 2026.
Where is it?
In Pogal, Banihal, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹24 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 6 Sept 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Apr 2026 |
| Application filed | 6 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹24 lakh |
| Village / locality | Pogal |
| Taluk / tehsil | Banihal |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03146 |
In context
30 applications in Ramban since January 2022 are in the same category (Telecom): 26 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2.6 years from filing to approval. At 0 acres, this one is smaller than 100% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pogal, Banihal, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of School Building Govt. Primary School Nakidhar — lapsed, 1.2 km away
- 2 ACR GMS Narthyal under Samagra Shiksha Education Department, District Ramban — lapsed, 1.3 km away
- Retrofitting of Water Supply Scheme Bass Panchal — forest land use approved, 1.4 km away
- Link Road from PMGSY Road to Upper Phagmulla via Kundhal Stage Ist — lapsed, 2.2 km away
- Construction and maintenance of Road from L034-(Link Road) PMGSY Road Bhingara… — more information requested, 2.5 km away
- Retrofitting of Water Supply Scheme Bingara — forest land use approved, 2.5 km away
- Construction and maintenance of Road from L033-Link Road from PMGSY Road… — more information requested, 2.8 km away
- Construction and maintenance of Road from L031-(Link Road) Dhanmasta to… — under forest review, 3.8 km away
More from Mahesh Nair in Ramban
- 4G Saturation Project Chanchloo — forest land use approved
- 4G Saturation Project Phagowonkote — forest land use approved
- 4G Saturation Project Darshipora — forest land use approved
- 4G Saturation Project Karlchihal — forest land use approved
- 4G Saturation Project Salbala — forest land use approved
- 4G Saturation Project Dachan — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.