Quick answers
What is Water Supply Scheme Kunoo Rajwalta?
Water Supply Scheme Kunoo Rajwalta is a proposed water and irrigation project in Kunu ( Kohnoo), Billawar, Kathua, Jammu and Kashmir. The site covers 0.5 acres.
Who is building it?
The applicant is Chief Engineer Jal Shakti Vibhag.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kunu ( Kohnoo), Billawar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹5 crore; a site of 0.5 acres and 920 m² of forest land.
When was it filed?
The application was filed on 15 Jun 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 4 May 2026 |
| Application filed | 15 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Jal Shakti Vibhag |
| Land area | 2,100 m² |
| Forest land | 920 m² |
| Project cost | ₹5 crore |
| Village / locality | Kunu ( Kohnoo) |
| Taluk / tehsil | Billawar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03184 |
In context
125 applications in Kathua since January 2022 are in the same category (Water & irrigation): 74 approved, 6 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 0.5 acres, this one is smaller than 82% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kunu ( Kohnoo), Billawar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project Bandhi & Mohni (Galak) — forest land use approved, 3.8 km away
- WSS Lakhri — lapsed, 5.1 km away
- Wss Kouli Koper — lapsed, 5.8 km away
- Wss Kouli Koper — lapsed, 5.8 km away
- Water Supply Scheme Kouli Koper — lapsed, 6.2 km away
- WSS Kouli Kooper — forest land use approved, 6.2 km away
- 4G Saturation Project Biyan — forest land use approved, 6.6 km away
- Water Supply Scheme Kacchir — forest land use approved, 6.8 km away
More from Chief Engineer Jal Shakti Vibhag in Kathua
- Water Supply Scheme Siada — lapsed
- Water Supply Scheme Athialta Part-2 — lapsed
- Water Supply Scheme Dinga Amb — lapsed
- Water Supply Scheme Dhalta — lapsed
- Water Supply Scheme Randood — lapsed
- Water Supply Scheme Sandhar Dodla — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.