Quick answers
What is Laying of Optical Cable on Ketson to Lohar Mohalla?
Laying of Optical Cable on Ketson to Lohar Mohalla is an approved telecom project in Aloosa, Bandipora, Bandipore, Jammu and Kashmir. The site covers 0.4 acres.
Who is building it?
The applicant is Vindhya Telelinks LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 27 Apr 2026), as of 27 Nov 2026.
Where is it?
In Aloosa, Bandipora, Bandipore, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹12 lakh; a site of 0.4 acres and 1,750 m² of forest land.
When was it filed?
The application was filed on 28 Oct 2022.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 27 Apr 2026 |
| Application filed | 28 Oct 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Vindhya Telelinks LTD |
| Land area | 1,800 m² |
| Forest land | 1,750 m² |
| Project cost | ₹12 lakh |
| Village / locality | Aloosa |
| Taluk / tehsil | Bandipora |
| District | Bandipore |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03221 |
In context
5 applications in Bandipore since January 2022 are in the same category (Telecom): 1 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aloosa, Bandipora, Bandipore, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- WSS Binlipora-B — lapsed, 750 m away
- 4G Saturation Project at Lashkoot — initial checks, 8.1 km away
- Water Supply Scheme Sangri Muqam — lapsed, 8.6 km away
- Diversion of 0.0225 HA. of Forest Land for construction of Mobile Tower for… — lapsed, 13.2 km away
- Working Shed for Material Recovery Facilities and Compost Pits for Waste… — cleared for impact study, 13.8 km away
- Wss Yalli Pethkoot — forest land use approved, 14.4 km away
- WSS Yalli Pethkoot — lapsed, 14.7 km away
- Wss Khursidpora Buthoo — forest land use approved, 16.1 km away
All 45 Vindhya Telelinks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.