Quick answers
What is Water Supply Scheme Sangri Muqam?
Water Supply Scheme Sangri Muqam is a lapsed water and irrigation project in Ashtongu, Bandipora, Bandipore, Jammu and Kashmir. The site covers 0.6 acres.
Who is building it?
The applicant is Public Health Engineering Department.
Has it been approved?
No. The application was lapsed on 14 Jul 2023, so it is no longer under consideration.
Where is it?
In Ashtongu, Bandipora, Bandipore, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹10.5 crore; a site of 0.6 acres and 1.5 acres (0.6 ha) of forest land.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Public Health Engineering Department |
| Land area | 2,400 m² |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹10.5 crore |
| Village / locality | Ashtongu |
| Taluk / tehsil | Bandipora |
| District | Bandipore |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01334 |
In context
53 applications in Bandipore since January 2022 are in the same category (Water & irrigation): 32 approved, 3 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2.8 years from filing to approval. At 0.6 acres, this one is larger than 83% of them.
Where it is
Ashtongu, Bandipora, Bandipore, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- WSS Binlipora-B — lapsed, 8 km away
- Laying of Optical Cable on Ketson to Lohar Mohalla — forest land use approved, 8.6 km away
- Working Shed for Material Recovery Facilities and Compost Pits for Waste… — cleared for impact study, 11.7 km away
- WSS Pethpora And Kanyari GundJehangeer (Retro) — more information requested, 12.9 km away
- 4G Saturation Project at Lashkoot — initial checks, 15.3 km away
- Water Supply Scheme Laman — lapsed, 16.2 km away
- Water Supply Scheme Laman Chewa under JJM — lapsed, 16.2 km away
- Water Supply Scheme Laman Chewa under JJM — lapsed, 16.2 km away
More from Public Health Engineering Department in Bandipore
- Water Supply Scheme S K Bala — lapsed
- Water Supply Scheme Laman — lapsed
3 Public Health Engineering Department, Jammu and Kashmir projects in Bandipore
All 8 Public Health Engineering Department, Jammu and Kashmir projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.