Quick answers
What is Water Supply Scheme Laman?
Water Supply Scheme Laman is a lapsed water and irrigation project in Gundi Sader Koot, Sonawari, Bandipore, Jammu and Kashmir. The site covers 0.4 acres.
Who is building it?
The applicant is Public Health Engineering Department.
Has it been approved?
No. The application was lapsed on 17 May 2023, so it is no longer under consideration.
Where is it?
In Gundi Sader Koot, Sonawari, Bandipore, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹8.2 crore; a site of 0.4 acres and 1,500 m² of forest land.
When was it filed?
The application was filed on 16 May 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 May 2023 |
| Application filed | 16 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Public Health Engineering Department |
| Land area | 1,600 m² |
| Forest land | 1,500 m² |
| Project cost | ₹8.2 crore |
| Village / locality | Gundi Sader Koot |
| Taluk / tehsil | Sonawari |
| District | Bandipore |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03228 |
In context
53 applications in Bandipore since January 2022 are in the same category (Water & irrigation): 32 approved, 3 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2.8 years from filing to approval. At 0.4 acres, this one is larger than 73% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gundi Sader Koot, Sonawari, Bandipore, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Scheme Laman Chewa under JJM — lapsed, 0 m away
- Water Supply Scheme Laman Chewa under JJM — lapsed, 0 m away
- Water Supply Scheme S K Bala — lapsed, 1.4 km away
- WSS Datiwas — lapsed, 10.1 km away
- Wss Datiwas — forest land use approved, 10.9 km away
- Working Shed for Material Recovery Facilities and Compost Pits for Waste… — cleared for impact study, 11.5 km away
- WSS T.A Shah — lapsed, 12.5 km away
- WSS T.A Shah — forest land use approved, 12.5 km away
More from Public Health Engineering Department in Bandipore
- Water Supply Scheme S K Bala — lapsed
- Water Supply Scheme Sangri Muqam — lapsed
3 Public Health Engineering Department, Jammu and Kashmir projects in Bandipore
All 8 Public Health Engineering Department, Jammu and Kashmir projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.