Cleared for impact studyMining · Kalaburagi, Karnataka

Ravur Limestone Mine Block (Area: 713 ha) with Proposed Limestone Production Capacity: 5.10 Million TPA, Topsoil: 0.022 Million TPA, OB: 0.454 Million TPA (Total Excavation: 5.576 Million TPA)

Ravur Limestone Mine Block (Area: 713 ha) with Proposed Limestone Production Capacity: 5.10 Million TPA, Topsoil: 0.022 Million TPA, OB: 0.454 Million TPA (Total Excavation: 5.576 Million TPA) is a proposed mining project in Ravur, Chittapur, Kalaburagi, Karnataka. The site covers 1,761.9 acres. Its stated project cost is ₹692 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Nov 2022).

See it on the live map All projects in Kalaburagi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Ravur Limestone Mine Block (Area: 713 ha) with Proposed Limestone Production Capacity: 5.10 Million TPA, Topsoil: 0.022 Million TPA, OB: 0.454 Million TPA (Total Excavation: 5.576 Million TPA) is a proposed mining project in Ravur, Chittapur, Kalaburagi, Karnataka. The site covers 1,761.9 acres.

Who is building it?

The applicant is UltraTech Cement Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 28 Nov 2022), as of 27 Nov 2026.

Where is it?

In Ravur, Chittapur, Kalaburagi, Karnataka.

How big is it?

It has a stated cost of ₹692 crore and a site of 1,761.9 acres.

When was it filed?

The application was filed on 28 Nov 2022.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Ravur Limestone Mine Block (Area: 713 ha) with Proposed Limestone Production Capacity:…

Project details

Official titleRavur Limestone Mine Block (Area: 713 ha) with Proposed Limestone Production Capacity: 5.10 Million TPA, Topsoil: 0.022 Million TPA, OB: 0.454 Million TPA (Total Excavation: 5.576 Million TPA) along with Installation of 1600 TPH capacity of Crusher with Wobbler at Villages: Ravur, Yaragal, K. Chittapur & K. Nagavva, Taluka: Chittapur, District: Kalaburagi, State: Karnataka.
StatusCleared for impact study
Status since28 Nov 2022
Application filed28 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantUltraTech Cement Limited
Land area1,761.9 acres (713 ha)
Project cost₹692 crore
Village / localityRavur
Taluk / tehsilChittapur
DistrictKalaburagi
StateKarnataka
Location fromSite area on record
Our referenceWID-KA-00116

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 17 Mar 2026Environmental approval granted1,761.9 acres₹692 crore
Early planning filed 28 Nov 2022 (this page)Cleared for impact study1,761.9 acres₹692 crore

In context

94 applications in Kalaburagi since January 2022 are in the same category (Mining): 71 approved, 12 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,761.9 acres, this one is larger than 94% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Ravur, Chittapur, Kalaburagi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from UltraTech Cement Limited in Kalaburagi

11 UltraTech Cement projects in Kalaburagi
All 182 UltraTech Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.