Quick answers
What is this project?
Integrated Cement Plant - Clinker: 9.0 Million TPA (2 x 4.5 Million TPA), Cement: 12.0 Million TPA (2 x 6.0 Million TPA), WHRS: 50 MW (2 x 25 MW) and DG Sets: 1500 kVA (2 x 750 kVA) at Villages: K Chittapur, P Chittapur & K Nagaon, Taluka: Chittapur, District: Kalaburagi, Karnataka by M/s. UltraTech Cement Limited (Unit: Ravur Cement Works) is a proposed industrial project in Chittapura.P, Chittapur, Kalaburagi, Karnataka. The site covers 409 acres.
Who is building it?
The applicant is UltraTech Cement Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Oct 2026), as of 27 Nov 2026.
Where is it?
In Chittapura.P, Chittapur, Kalaburagi, Karnataka.
How big is it?
It has a stated cost of ₹2,800 crore and a site of 409 acres.
When was it filed?
The application was filed on 13 Oct 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 13 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | UltraTech Cement Limited |
| Land area | 409 acres (165.5 ha) |
| Project cost | ₹2,800 crore |
| Village / locality | Chittapura.P |
| Taluk / tehsil | Chittapur |
| District | Kalaburagi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04569 |
In context
38 applications in Kalaburagi since January 2022 are in the same category (Industry): 23 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 409 acres, this one is smaller than 55% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chittapura.P, Chittapur, Kalaburagi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ravur Limestone Mine Block (Area: 713 ha) with Proposed Limestone Production… — cleared for impact study, 2.7 km away
- Ravur Limestone Mine Block (Area: 713 ha) with Proposed Limestone Production… — environmental approval granted, 3 km away
- Chittapur SW Limestone Block over an area of 438 Ha. with Limestone production… — cleared for impact study, 3.3 km away
- Bommanalli Limestone Mine Block — environmental approval granted, 6.6 km away
- Bommanalli Limestone Mine Block — cleared for impact study, 6.6 km away
- Shahabad Stone Quarrying Project — environmental approval granted, 7.6 km away
- Shahabad Stone Quarry (QL No. S-521) "Sri. Vajrakumar" — lapsed, 7.6 km away
- Environmental Clearance for Shahabad Stone (Cherty Limestone) Quarry in 1-00… — environmental approval granted, 7.9 km away
More from UltraTech Cement Limited in Kalaburagi
- Proposed Udagi Limestone Block (Area: 646.34 ha) with Limestone Production… — cleared for impact study
- Ravur Limestone Mine Block (Area: 713 ha) with Proposed Limestone Production… — environmental approval granted
- Transfer of Environmental Clearance for Injepalli Limestone Mine (ML Area… — environmental approval granted
- Proposed Diggaon Limestone Block (ML Area – 786.32 ha) with Limestone… — environmental approval granted
- Transfer of Environmental Clearance for Expansion of Cement Plant Clinker -… — environmental approval granted
- Transfer of Environmental Clearance for Expansion of Integrated Cement Plant… — lapsed
11 UltraTech Cement projects in Kalaburagi
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.