Quick answers
What is this project?
Expansion of Distillery Capacity From 600 Klpd to 1000 Klpd Using Sugarcane Syrup Or 400 Klpd to 600 Klpd Using B Heavy Molasses Or 320 Klpd to 400 Klpd Using C Heavy Molasses and 200 Klpd Grain Based/Sugarbeet As Raw Material to Produce Ethanol. and to Enhance Captive Power Plant From 14 MW to 22 MW and Expansion of Sugarcane Crushing Capacity From 20000 Tcd to 25000 Tcd to Augment the Requirement of Sugar Syrup to the Distillery by M/S Godavari Bio Refineries LTD is an approved industrial project in Bisnal, Rabakavi Banahatti, Bagalkote, Karnataka. The site covers 382 acres.
Who is building it?
The applicant is Godavari Biorefineries LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Dec 2023), as of 27 Nov 2026.
Where is it?
In Bisnal, Rabakavi Banahatti, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹1,694 crore and a site of 382 acres.
When was it filed?
The application was filed on 27 Sept 2023.
Project details
| Official title | Expansion of Distillery Capacity From 600 Klpd to 1000 Klpd Using Sugarcane Syrup Or 400 Klpd to 600 Klpd Using B Heavy Molasses Or 320 Klpd to 400 Klpd Using C Heavy Molasses and 200 Klpd Grain Based/Sugarbeet As Raw Material to Produce Ethanol. and to Enhance Captive Power Plant From 14 MW to 22 MW and Expansion of Sugarcane Crushing Capacity From 20000 Tcd to 25000 Tcd to Augment the Requirement of Sugar Syrup to the Distillery Under Ebp Scheme by M/S Godavari Bio Refineries LTD. |
|---|---|
| Status | Environmental approval granted |
| Status since | 8 Dec 2023 |
| Application filed | 27 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Godavari Biorefineries LTD |
| Land area | 382 acres (154.6 ha) |
| Project cost | ₹1,694 crore |
| Village / locality | Bisnal |
| Taluk / tehsil | Rabakavi Banahatti |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00342 |
In context
61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 382 acres, this one is larger than 97% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bisnal, Rabakavi Banahatti, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed NIPL for Reconfiguration of Existing Multi-Feedstock Distillery with… — initial checks, 0 m away
- Building Stone Quarry — lapsed, 10.2 km away
- Building Stone Quarry — cleared for impact study, 10.2 km away
- "Building Stone Quarry"of Sri. Balachandra A. Nandeppanavar, — lapsed, 10.3 km away
- "Building Stone Quarry"of Sri. Balachandra A. Nandeppanavar, — cleared for impact study, 10.3 km away
- Building Stone & Manufacturing of M-Sand Quarry of Sri Vidhyadhar S Savadi — cleared for impact study, 10.3 km away
- Sri. Vidhyadhar S Savadi — lapsed, 10.3 km away
- Building Stone Quarry — lapsed, 10.5 km away
More from Godavari Biorefineries LTD in Bagalkote
All 4 Godavari Biorefineries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.