What is Developing? Open the mapMap

Initial checksIndustry · Bagalkote, Karnataka

Proposed NIPL for Reconfiguration of Existing Multi-Feedstock Distillery with Grain-Based Ethanol Enhancement (200–400 KLPD), DWGS/DDGS (140–305 TPD), and Existing EC/CTO-Approved Capacities for Syrup Ethanol (800 KLPD), B-Heavy (400 KLPD), C-Heavy (320 KLPD), Sugarbeet (200 KLPD), ENA (260 KLPD), CPP (14 MW), CO₂ (590 TPD), Wax (100 MT/month) & Associated Facilities

Proposed NIPL for Reconfiguration of Existing Multi-Feedstock Distillery with Grain-Based Ethanol Enhancement (200–400 KLPD), DWGS/DDGS (140–305 TPD), and Existing EC/CTO-Approved Capacities for Syrup Ethanol (800 KLPD), B-Heavy (400 KLPD), C-Heavy (320 KLPD), Sugarbeet (200 KLPD), ENA (260 KLPD), CPP (14 MW), CO₂ (590 TPD), Wax (100 MT/month) & Associated Facilities is a proposed industrial project in Bisnal, Rabakavi Banahatti, Bagalkote, Karnataka. The site covers 382 acres. Its stated project cost is ₹917 crore. As of 27 Nov 2026, its status is “Initial checks” (since 11 Sept 2026).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed NIPL for Reconfiguration of Existing Multi-Feedstock Distillery with Grain-Based Ethanol Enhancement (200–400 KLPD), DWGS/DDGS (140–305 TPD), and Existing EC/CTO-Approved Capacities for Syrup Ethanol (800 KLPD), B-Heavy (400 KLPD), C-Heavy (320 KLPD), Sugarbeet (200 KLPD), ENA (260 KLPD), CPP (14 MW), CO₂ (590 TPD), Wax (100 MT/month) & Associated Facilities is a proposed industrial project in Bisnal, Rabakavi Banahatti, Bagalkote, Karnataka. The site covers 382 acres.

Who is building it?

The applicant is Godavari Biorefineries LTD.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Bisnal, Rabakavi Banahatti, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹917 crore and a site of 382 acres.

When was it filed?

The application was filed on 11 Sept 2026.

Project details

StatusInitial checks
Status since11 Sept 2026
Application filed11 Sept 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantGodavari Biorefineries LTD
Land area382 acres (154.6 ha)
Project cost₹917 crore
Village / localityBisnal
Taluk / tehsilRabakavi Banahatti
DistrictBagalkote
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-05531

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 382 acres, this one is larger than 97% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bisnal, Rabakavi Banahatti, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Godavari Biorefineries LTD in Bagalkote

All 4 Godavari Biorefineries projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.