One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of M/s. Minera Steel and Power Private Limited from 0.15 MTPA to 0.65 MTPA…
Project details
| Official title | Expansion of M/s. Minera Steel and Power Private Limited from 0.15 MTPA to 0.65 MTPA capacity and Captive Power Plant (18 MW to 46 MW) at Yerabanahalli Village, Sandur Taluk in Ballari District of Karnataka State. |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 14 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Minera Steel & Power Private Limited |
| Land area | 265.6 acres (107.5 ha) |
| Project cost | ₹2,608 crore |
| Village / locality | Yerabanahalli |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00356 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 22 Jun 2023 | Lapsed | 265.6 acres | ₹2,608 crore |
| Early planning filed 14 Jun 2023 (this page) | Lapsed | 265.6 acres | ₹2,608 crore |
In context
80 applications in Ballari since January 2022 are in the same category (Industry): 45 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 265.6 acres, this one is larger than 66% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Yerabanahalli, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of M/s. Minera Steel and Power Private Limited from 0.15 MTPA to… — lapsed, 0 m away
- Industrial project by Jsw Projects Limited — lapsed, 50 m away
- Amendment in Environment Clearance for Proposed Technology Change by Replacing… — returned to applicant, 600 m away
- Proposed Production Capacity Enhancement of Iron ore Pellet Plant From 8.0… — initial checks, 600 m away
- Expansion in Environmental Clearance of the existing Ferro Alloys and Coke… — under environmental review, 1.6 km away
- Transfer of Environmental Clearances, from 'M/s A-One Steels India Pvt. Ltd.'… — environmental approval granted, 1.6 km away
- Application for Split of EC obtained vide File No. J-11011/500/2017-IA-II(I),… — environmental approval granted, 2.5 km away
- Application for Split of EC obtained vide File No. J-11011/500/2017-IA-II(I),… — returned to applicant, 2.5 km away
More from Minera Steel & Power Private Limited in Ballari
- 0.49 MTPA beneficiation plant — cleared for impact study
- Amendment in Environment Clearance for Proposed Technology Change by Replacing… — returned to applicant
- Proposed Production Capacity Enhancement of Iron ore Pellet Plant From 8.0… — initial checks
5 Minera Steel & Power projects in Ballari
All 7 Minera Steel & Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.