Project details
| Official title | Proposed Production Capacity Enhancement of Iron ore Pellet Plant From 8.0 LTPA to 9.0 LTPA with 'No Increase in Pollution Load' Under the provision of SO 980-(E), dated 2nd March, 2021 |
|---|---|
| Status | Initial checks |
| Status since | 18 Sept 2025 |
| Application filed | 18 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Minera Steel & Power Private Limited |
| Land area | 137.7 acres (55.7 ha) |
| Project cost | ₹215 crore |
| Village / locality | Sultanapur |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-03251 |
In context
80 applications in Ballari since January 2022 are in the same category (Industry): 45 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 137.7 acres, this one is smaller than 54% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sultanapur, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment in Environment Clearance for Proposed Technology Change by Replacing… — returned to applicant, 0 m away
- Industrial project by Jsw Projects Limited — lapsed, 600 m away
- Expansion of M/s. Minera Steel and Power Private Limited from 0.15 MTPA to… — lapsed, 600 m away
- Expansion of M/s. Minera Steel and Power Private Limited from 0.15 MTPA to… — lapsed, 600 m away
- Expansion in Environmental Clearance of the existing Ferro Alloys and Coke… — under environmental review, 1.6 km away
- Transfer of Environmental Clearances, from 'M/s A-One Steels India Pvt. Ltd.'… — environmental approval granted, 1.6 km away
- Application for Split of EC obtained vide File No. J-11011/500/2017-IA-II(I),… — environmental approval granted, 2.7 km away
- Application for Split of EC obtained vide File No. J-11011/500/2017-IA-II(I),… — returned to applicant, 2.7 km away
More from Minera Steel & Power Private Limited in Ballari
- 0.49 MTPA beneficiation plant — cleared for impact study
- Amendment in Environment Clearance for Proposed Technology Change by Replacing… — returned to applicant
- Expansion of M/s. Minera Steel and Power Private Limited from 0.15 MTPA to… — lapsed
- Expansion of M/s. Minera Steel and Power Private Limited from 0.15 MTPA to… — lapsed
5 Minera Steel & Power projects in Ballari
All 7 Minera Steel & Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.