Project details
| Status | Returned to applicant |
|---|---|
| Status since | 13 Jan 2024 |
| Application filed | 1 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Industry |
| Applicant | Agarwal Sponge and Energy Private Limited |
| Land area | 44.1 acres (17.8 ha) |
| Project cost | ₹568.2 crore |
| Village / locality | Kudatini |
| Taluk / tehsil | Ballari |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00619 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Other filed 1 Dec 2023 (this page) | Returned to applicant | 44.1 acres | ₹568.2 crore |
| New project filed 29 Mar 2023 | Environmental approval granted | 44.1 acres | ₹568.2 crore |
In context
80 applications in Ballari since January 2022 are in the same category (Industry): 45 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 44.1 acres, this one is smaller than 76% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kudatini, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Splitting of E.C. granted to M/s. AGARWAL SPONGE & ENERGY PVT. LTD. vide order… — environmental approval granted, 0 m away
- Transfer of EC from AGARWAL SPONGE & ENERGY PVT. LTD. lto AGARWAL INDUCTION… — lapsed, 0 m away
- Expansion of existing Sponge Iron & Power Plant by installation of additional… — environmental approval granted, 0 m away
- Proposed Mineral Beneficiation plant of Capacity 1.0 MTPA by M/s. Hothur Ispat… — cleared for impact study, 1.5 km away
- Sponge Iron Unit- 62,700 TPA (2 X 95 TPD), M S Billets- 39,600 TPA by… — environmental approval granted, 2.2 km away
- Sponge Iron Unit- 62,700 TPA (2 X 95 TPD), M S Billets- 39,600 TPA by… — cleared for impact study, 2.2 km away
- Proposed Expansion of Sponge Iron Plant from 75 TPD to 300 TPD by upgrading… — environmental approval granted, 2.3 km away
- Proposed Haraginadoni Industrial Area (Kuduthini Phase -3), Kudithini Village,… — cleared for impact study, 2.5 km away
More from Agarwal Sponge and Energy Private Limited in Ballari
- Splitting of E.C. granted to M/s. AGARWAL SPONGE & ENERGY PVT. LTD. vide order… — environmental approval granted
All 3 Agarwal Sponge and Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.