Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Jan 2024 |
| Application filed | 6 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Aaress Iron and Steel Limited |
| Land area | 922.2 acres (373.2 ha) |
| Project cost | ₹17,979 crore |
| Village / locality | Hulavarti |
| Taluk / tehsil | Koppal |
| District | Koppal |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00692 |
In context
48 applications in Koppal since January 2022 are in the same category (Industry): 28 approved, 16 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 922.2 acres, this one is larger than 96% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hulavarti, Koppal, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 3.5 mtpa integrated Steel Plant including Captive Power Plant 295 MW of M/s… — environmental approval granted, 900 m away
- Increasing Iron Ore Pellet Production in Existing Plant From 1.2 MTPA to 1.5… — initial checks, 1.2 km away
- Increase Of Iron Ore Pellet Production in Existing Plant From 1.2 MTPA to 1.5… — initial checks, 1.2 km away
- Increase of Iron Ore Pellet Production in Existing Plant From 1.2 Mtpa to 1.5… — initial checks, 1.2 km away
- "Expansion of Integrated Steel Plant with capacity of Sponge Iron (DRI) Plant… — cleared for impact study, 2.6 km away
- Industrial project by M/s. PBS STEEL (Unit of M/s. P Balasubba Setty and Son) — environmental approval granted, 2.7 km away
- Industrial project by M/s. PBS STEEL (Unit of M/s. P Balasubba Setty and Son) — cleared for impact study, 2.7 km away
- Building Stone Quarry — under environmental review, 3 km away
More from Aaress Iron and Steel Limited in Koppal
- 3.5 mtpa integrated Steel Plant including Captive Power Plant 295 MW of M/s… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.