Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Mar 2024 |
| Application filed | 15 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Aaress Iron and Steel Limited |
| Land area | 922.2 acres (373.2 ha) |
| Project cost | ₹1,800 crore |
| Village / locality | Kidadhala |
| Taluk / tehsil | Koppal |
| District | Koppal |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-01480 |
In context
48 applications in Koppal since January 2022 are in the same category (Industry): 28 approved, 16 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 922.2 acres, this one is larger than 98% of them.
32 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kidadhala, Koppal, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated steel Plant 3.5 MTPA and Including Captive Power Plant 295 MW Of… — environmental approval granted, 900 m away
- Increasing Iron Ore Pellet Production in Existing Plant From 1.2 MTPA to 1.5… — initial checks, 1.8 km away
- Increase Of Iron Ore Pellet Production in Existing Plant From 1.2 MTPA to 1.5… — initial checks, 1.8 km away
- Increase of Iron Ore Pellet Production in Existing Plant From 1.2 Mtpa to 1.5… — initial checks, 1.8 km away
- Industrial project by M/s. PBS STEEL (Unit of M/s. P Balasubba Setty and Son) — environmental approval granted, 1.9 km away
- Industrial project by M/s. PBS STEEL (Unit of M/s. P Balasubba Setty and Son) — cleared for impact study, 1.9 km away
- "Expansion of Integrated Steel Plant with capacity of Sponge Iron (DRI) Plant… — cleared for impact study, 2.1 km away
- "Iron Ore Beneficiation Plant" of M/s. Gavi Metallics Private Limited — more information requested, 2.4 km away
More from Aaress Iron and Steel Limited in Koppal
- Integrated steel Plant 3.5 MTPA and Including Captive Power Plant 295 MW Of… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.