Quick answers
What is this project?
Expansion of Sugar Plant From 3500 Tcd to 7500 Tcd, Co-Generation Power Plant From 15 MW to 30 MW and Establishment of New Distillery Unit of 300 Klpd to Produce Ethanol Using Multi Feedstocks and Installation of Captive Power Plant of 6 MW by M/S. Manali Sugars Limited is a lapsed power project in Malaghan, Almel, Vijayapura, Karnataka. The site covers 102.4 acres.
Who is building it?
The applicant is Sri Sai Basava Sugars Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Malaghan, Almel, Vijayapura, Karnataka.
How big is it?
It has a stated cost of ₹502.3 crore and a site of 102.4 acres.
When was it filed?
The application was filed on 11 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Sugar Plant From 3500 Tcd to 7500 Tcd, Co-Generation Power Plant From 15 MW…
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 11 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Power |
| Applicant | Sri Sai Basava Sugars Limited |
| Land area | 102.4 acres (41.4 ha) |
| Project cost | ₹502.3 crore |
| Village / locality | Malaghan |
| Taluk / tehsil | Almel |
| District | Vijayapura |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00694 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 11 Nov 2023 (this page) | Lapsed | 102.4 acres | ₹502.3 crore |
| Early planning filed 11 Nov 2023 | Lapsed | 102.4 acres | ₹502.3 crore |
In context
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malaghan, Almel, Vijayapura, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment to the Environmental Clearance Issued for Expanding the Sugar Plant,… — environmental approval granted, 0 m away
- Distillery of 300 KLPD and Captive Power Plant of 6 MW and Expansion of the… — withdrawn, 0 m away
- Distillery of 300 KLPD and Captive Power Plant of 6 MW and Expansion of the… — withdrawn, 0 m away
- Distillery of 300 KLPD and Captive Power Plant of 6 MW and Expansion of the… — withdrawn, 0 m away
- Expansion of Sugar Plant From 3500 Tcd to 7500 Tcd, Co-Generation Power Plant… — lapsed, 0 m away
- Distillery of 300 KLPD and Captive Power Plant of 6 MW and Expansion of the… — lapsed, 0 m away
- Distillery of 300 KLPD and Captive Power Plant of 6 MW and Expansion of the… — environmental approval granted, 0 m away
- Distillery of 300 KLPD and Captive Power Plant of 6 MW and Expansion of the… — environmental approval granted, 0 m away
More from Sri Sai Basava Sugars Limited in Vijayapura
- Amendment to the Environmental Clearance Issued for Expanding the Sugar Plant,… — environmental approval granted
- Distillery of 300 KLPD and Captive Power Plant of 6 MW and Expansion of the… — withdrawn
- Distillery of 300 KLPD and Captive Power Plant of 6 MW and Expansion of the… — withdrawn
- Distillery of 300 KLPD and Captive Power Plant of 6 MW and Expansion of the… — withdrawn
- Distillery of 300 KLPD and Captive Power Plant of 6 MW and Expansion of the… — lapsed
- Distillery of 300 KLPD and Captive Power Plant of 6 MW and Expansion of the… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.