Quick answers
What is Sankanoor Off-Stream Closed Loop Pumped Storage Project?
Sankanoor Off-Stream Closed Loop Pumped Storage Project is a proposed water and irrigation project in Alhalli, Chittapur, Kalaburagi, Karnataka. The site covers 1,523.8 acres.
Who is building it?
The applicant is Cerulean Energy Solutions Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Aug 2023), as of 27 Nov 2026.
Where is it?
In Alhalli, Chittapur, Kalaburagi, Karnataka.
How big is it?
It has a stated cost of ₹1,946.5 crore and a site of 1,523.8 acres.
When was it filed?
The application was filed on 22 May 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Aug 2023 |
| Application filed | 22 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Cerulean Energy Solutions Private Limited |
| Land area | 1,523.8 acres (616.7 ha) |
| Project cost | ₹1,946.5 crore |
| Village / locality | Alhalli |
| Taluk / tehsil | Chittapur |
| District | Kalaburagi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-01133 |
Where it is
Alhalli, Chittapur, Kalaburagi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bommanalli Limestone Mine Block — environmental approval granted, 8.3 km away
- Bommanalli Limestone Mine Block — cleared for impact study, 8.3 km away
- Shahabad Stone Quarrying Project — environmental approval granted, 9.9 km away
- Chittapur SW Limestone Block over an area of 438 Ha. with Limestone production… — cleared for impact study, 11.2 km away
- Kannur (Wadi area) Limestone Block (auction block) having lease area of 550 Ha… — environmental approval granted, 13.5 km away
- Proposing for Expansion of Integrated Cement Plant (Clinker – 6.45 to 18.51… — cleared for impact study, 14 km away
- Limestone Mine (Area: 471.03 Ha) with Limestone Production Capacity 7.72 MTPA… — lapsed, 14.2 km away
- Integrated Cement Plant - Clinker: 9.0 Million TPA (2 x 4.5 Million TPA),… — cleared for impact study, 14.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.