What is Developing? Open the mapMap

Cleared for impact studyIndustry · Bagalkote, Karnataka

Production of Rs/Ena/Ethanol Using Multi Feedstock B/C Heavy Molasses/Sugar Syrup/Grain in the Existing Distillery of 400 Klpd Capacity by M/S. Trualt Bioenergy Limited - Unit 3.

Production of Rs/Ena/Ethanol Using Multi Feedstock B/C Heavy Molasses/Sugar Syrup/Grain in the Existing Distillery of 400 Klpd Capacity by M/S. Trualt Bioenergy Limited - Unit 3 is a proposed industrial project in Kallapur, Badami, Bagalkote, Karnataka. The site covers 17.6 acres. Its stated project cost is ₹235.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 15 Mar 2024).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Production of Rs/Ena/Ethanol Using Multi Feedstock B/C Heavy Molasses/Sugar Syrup/Grain in the Existing Distillery of 400 Klpd Capacity by M/S. Trualt Bioenergy Limited - Unit 3 is a proposed industrial project in Kallapur, Badami, Bagalkote, Karnataka. The site covers 17.6 acres.

Who is building it?

The applicant is TRUALT BIOENERGY LIMITED - Unit 3.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 15 Mar 2024), as of 27 Nov 2026.

Where is it?

In Kallapur, Badami, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹235.9 crore and a site of 17.6 acres.

When was it filed?

The application was filed on 15 Mar 2024.

Project details

StatusCleared for impact study
Status since15 Mar 2024
Application filed15 Mar 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantTRUALT BIOENERGY LIMITED - Unit 3
Land area17.6 acres (7.1 ha)
Project cost₹235.9 crore
Village / localityKallapur
Taluk / tehsilBadami
DistrictBagalkote
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-01382

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 10 Aug 2026More information requested17.6 acres₹235.9 crore
Expansion filed 26 May 2026Returned to applicant17.6 acres₹235.9 crore
Early planning filed 15 Mar 2024 (this page)Cleared for impact study17.6 acres₹235.9 crore

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 17.6 acres, this one is smaller than 97% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kallapur, Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 TRUALT BIOENERGY LIMITED projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.