What is Developing? Open the mapMap

Cleared for impact studyIndustry · Bagalkote, Karnataka

Proposed expansion of Sugarcane crushing capacity from existing 12000 TCD to 18000 TCD by M/s. Shri Prabhulingeshwar Sugars and Chemicals Ltd.,

Proposed expansion of Sugarcane crushing capacity from existing 12000 TCD to 18000 TCD by M/s. Shri Prabhulingeshwar Sugars and Chemicals Ltd is a proposed industrial project in Siddapur, Jamkhandi, Bagalkote, Karnataka. The site covers 110 acres. Its stated project cost is ₹532.6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 12 Feb 2024).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed expansion of Sugarcane crushing capacity from existing 12000 TCD to 18000 TCD by M/s. Shri Prabhulingeshwar Sugars and Chemicals Ltd is a proposed industrial project in Siddapur, Jamkhandi, Bagalkote, Karnataka. The site covers 110 acres.

Who is building it?

The applicant is Shri Prabhulingeshwar Sugars and Chemicals Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 12 Feb 2024), as of 27 Nov 2026.

Where is it?

In Siddapur, Jamkhandi, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹532.6 crore and a site of 110 acres.

When was it filed?

The application was filed on 23 Jan 2024.

Project details

StatusCleared for impact study
Status since12 Feb 2024
Application filed23 Jan 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShri Prabhulingeshwar Sugars and Chemicals Limited
Land area110 acres (44.5 ha)
Project cost₹532.6 crore
Village / localitySiddapur
Taluk / tehsilJamkhandi
DistrictBagalkote
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-01559

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 27 May 2025Lapsed110 acres₹532.6 crore
Early planning filed 23 Jan 2024 (this page)Cleared for impact study110 acres₹532.6 crore

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 110 acres, this one is larger than 70% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Siddapur, Jamkhandi, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.