Quick answers
What is this project?
Proposed Industrial and Warehouse Building project by M/s. Sunlarge Developers Pvt ltd is an approved industrial building project in Alahalli, Kolar, Karnataka. It plans 7 towers on 40.9 acres.
Who is building it?
The applicant is Indospace Park Narsapura II Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Nov 2024), as of 27 Nov 2026.
Where is it?
In Alahalli, Kolar, Karnataka.
How big is it?
It has a stated cost of ₹222 crore and a site of 40.9 acres.
When was it filed?
The application was filed on 17 Aug 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Industrial and Warehouse Building project by M/s. Sunlarge Developers Pvt ltd
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Nov 2024 |
| Application filed | 17 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Indospace Park Narsapura II Private Limited |
| Use | Industrial |
| Towers | 7 |
| Parking spaces | 658 |
| Land area | 40.9 acres (16.6 ha) |
| Built-up area | 82,313 m² (8,86,009 sq ft) |
| Plot area | 1,65,516 m² (17,81,598 sq ft) |
| Project cost | ₹222 crore |
| Village / locality | Alahalli |
| Taluk / tehsil | Kolar |
| District | Kolar |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-02083 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 13 Jan 2026 | Environmental approval granted | 40.9 acres | ₹222 crore |
| New project filed 17 Aug 2024 (this page) | Environmental approval granted | 40.9 acres | ₹222 crore |
In context
25 applications in Kolar since January 2022 are in the same category (Buildings & townships): 12 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 40.9 acres, this one is smaller than 56% of them.
34 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alahalli, Kolar, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Industrial and Warehouse Building project by M/s. Sunlarge Developers… — environmental approval granted, 0 m away
- Industrial and Warehouse Building by M/s. IndoSpace Park Narsapura II Private… — environmental approval granted, 0 m away
- Widening of Existing Road From Narasipura - Shivarapattana Road to Alahalli… — more information requested, 150 m away
- Proposed Industrial and Logistics Park project by M/s. Jurojin Developers… — under environmental review, 1.7 km away
- Expansion of Factory Building by M/s. Mahindra Aerostructures Private Limited — environmental approval granted, 1.7 km away
- Jakkasandra Industrial Area Phase-II (Mindahalli) — environmental approval granted, 1.9 km away
- Proposed "Warehousing, Industrial and Logistics Park" project by M/s. ILV… — under environmental review, 2 km away
- Expansion of Assembling of Smart Phones and Printed Circuit Boards (PCB)… — environmental approval granted, 2.2 km away
More from Indospace Park Narsapura II Private Limited in Kolar
- Industrial and Warehouse Building by M/s. IndoSpace Park Narsapura II Private… — environmental approval granted
All 3 Indospace Park Narsapura II projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.